ThomasNet.com
Home > White Papers > Article Abstract

ANSI/TIA/EIA - 569

Publisher: Belden, Inc.
Overview:
This paper discusses the ANSI/TIA/EIA-569-A (CSA T530) standard which provides design specifications and guidance for building facilities relating to telecommunications cabling systems and components. The location and the components of an Entrance Facility and the design considerations and sizing issues of an Equipment Room are outlined. Inter-Building Pathways such as underground, direct-buried, aerial, and tunnel backbone pathways are overviewed. The design and components of vertical and horizontal backbone pathways of intra-building pathways are explained. The paper reviews the design, size, and spacing considerations of Telecommunication Room. Besides the horizontal pathways from the work area outlet to the telecommunications room that paper also provides a list and brief description of pathways recognized by the ANSI/TIA/EIA-569-A (CSA T530) standard. Recommendations for work areas covering specifications for telecommunications pathways and telecommunications outlets are elaborated. Six addenda to ANSI/TIA/EIA-569-A on Surface Raceways, Furniture Pathways and Spaces, Access Floors, Poke-Thru fittings, Underfloor Pathways, Multi-Tenant Pathways and Spaces are explained. The report also describes ANSI/TIA/EIA-607 (CSA T527) standard which covers grounding and bonding requirements.
TABLE OF CONTENTS
1.ANSI/TIA/EIA-569-A (CSA T530)1
2.Entrance Facility1
3.Equipment Room1
3.1General Design Considerations1
3.2Sizing Issues1
3.3Other Equipment Room Design Issues1
4.Inter-Building Pathways2
4.1Underground Inter-building Backbone Pathways2
4.2Direct Buried Inter-building Backbone Pathways2
4.3Aerial Inter-building Backbone Pathways2
4.4Tunnel Inter-building Backbone Pathways2
5.Intra-Building (In-Building) Pathways2
5.1Vertical Backbone Pathways2
5.2Horizontal Backbone Pathways2
5.3Design Issues2
6.Telecommunications Room3
6.1General Design Considerations3
6.2Size and Spacing Issues3
6.3Other TR design issues3
7.Horizontal Pathways3
7.1Underfloor Duct3
7.2Access Floor3
7.3Conduit4
7.4Cable Trays and Wireways4
7.5Ceiling Pathways4
7.6Perimeter Raceways4
7.7Power Separation4
8.Work Area4
8.1Work Area Recommendations4
8.2Telecommunications Outlets5
9.New Addenda To ANSI/TIA/EIA-569-A5
9.1Addendum 1: Surface Raceways5
9.2Addendum 2: Furniture Pathways and Spaces5
9.3Addendum 3: Access Floors5
9.4Addendum 4: Poke-Thru fittings5
9.5Addendum 5: Underfloor Pathways5
9.6Addendum 6: Multi-Tenant Pathways and Spaces5
9.7Not Covered By the ANSI/TIA/EIA-569-A Standard5
10.ANSI/TIA/EIA-607 (CSA T527)6
11.Bonding and Grounding6
12.Components6
12.1Bonding Conductor for Telecommunications6
12.2Telecommunications Bonding Backbone (TBB)6
View Now
Feedback

Copyright© 2014 Thomas Publishing Company. All Rights Reserved. See Terms and Conditions or Privacy Statement. Website Last Modified April 19, 2014.

Thomas Register® and Thomas Regional® are part of ThomasNet.com.

ThomasNet Is A Registered Trademark Of Thomas Publishing Company.

print screen